Construction Electrical Mobile Substation (33/11-31.5×2 MVA) Within the Japanese Substation.
You are here: Home Construction Electrical Mobile Substation (33/11-31.5×2 MVA) Within the Japanese Substation. Client: Wassit Province. POC: Wassit Province. Description: Design and Construction of (33/11-31.5×2 MVA) Substation within the Japanese Station. The works include extending cable 11 KV of Length 2 x 4800 m to Hay AL-Damuk Feeder in Kut. Works done as joint venture with Al-Khirbit…