Design and Construction of a new water treatment plant in Al-Ramadi with (10000 m3/ hr.) including the pipelines networks.
Client: Ministry of Municipalities and Public work – Al-Anbar Water Directorate.
Client: Ministry of Municipalities and Public work – Al-Anbar Water Directorate.
Description: Design and construction of a new water treatment plant in Al-Ramadi city with 10000 m³/hr capacity, the work includes design and construction of low left pump station with clarifiers, filters, chemicals buildings, channels and high left pump station. The work includes design and laying of new pipelines networks about (85 Kilometer length) to service many sectors as follows:
- AL-ZNGORA villages with capacity of 1000 m³/hr.
- EMARAT AL-SAKANIA with capacity of 2000 m³/hr. 3- AL-JAMEEA with capacity of 4500 m³/hr.
- AL-MALEEB with capacity of 2500 m³/hr.
Staff Details: Danube and partners works together to design and construct this project with high qualified and experienced engineers and technicians to manage the site and office activities, our offices inside and outside Iraq with partners support the project by purchasing material needed for the project. A total of 35 engineers, 60 technicians and 10 highly educated administrative personnel cover all the phases of the project design and construction.