CIVIL AND BUILDING WORKS FOR WELL PAD #7, 8, 10 AREA – West Qurna Field 2nd Phase Project
Client: SAMSUNG IRAQ, SAMSUNG GEC, 500 Sangil-dong, Gangdong-gu, Seoul, Korea 134-090]. Iraq Branch Office with an address at 306-16, House no. 5/2, in front of Al-Hariri High school, Maghreb Street, Baghdad, Iraq.
OWNER: LUKOIL MID-EAST LIMITED
POC: Kyung Tae Kim, Vice President, Seokyoon Lee, Field Engineer, Mobile 82-10-9690-1258, Phone 82-2-3458-5813, E-mail seokyoonbest.lee@samsung.com.
Project description summary: Include but not limited to supply of all materials, tools and equipment, accessories, manpower for direct and indirect work for construction execution, test and inspection, including all supply and services required for the successful completion of work, strictly complying with the relevant Technical Documents, Design, Specification, Code and Schedule, collectively known as “Civil and Building Works for Well Pad #7, 8, 10 Area”.
Project Staff details: Site office fully equipped and functioned with highly experienced engineers and technicians to managing the site’s activities was established. Our HQ, branches and abroad offices supported the project by purchasing and importing the required and needed equipment, both Baghdad and Amman offices has collaborated to support the vital administration and correspondence needs, the site’s staff was entirely comprised of local workers. Most of unskilled workers were hired from near cities to encourage employment in very poor area, beside hundreds of skilled and unskilled workers, a total of 20 engineers, 29 technicians and 10 administrators working as one group to achieve the completion of the contract as in the planned and scheduled time.