Project
name: Buhriz Bridge on Diyala River
in Diyala.
Client: CAPE Environmental
POC: James Stewart tel: +1732
610 9692, E-mail: jstewart@cape-inc.com
Description:
Surveying, engineering and construction of
a 220 meter concrete bridge over the Diyala
River in Buhriz, 50 kilometers east of Baghdad.
The bridge contains seven concrete girders
spanning 24 meters each with the middle span
measuring 48 meters wide utilizing a steel
girder. The bridge connects the main Baghdad-Baqubah
road and Buhriz city. The University of Baghdad
performed quality control functions, and The
National State laboratory was responsible
for all field and laboratory tests.
Staff details: A site office with
highly experienced engineers and technicians
managed the site activities. Outside Iraq,
our offices supported the project by purchasing
equipment and instruments, The Baghdad HQ
supported vital administration and correspondence.
The site staff was mainly from the local area
to encourage employment in war affected area.
A total of 16 engineers, 35 technicians and
8 administrative personnel are covered project
activities.
Start
Date: November 2005
Completion date: December
2006

|